We spent Thursday and Friday finishing off the gables, cutting blocks to fit the angle of the roof took ages. Many thanks to Steve for coming to help out!
The finished gable ends look really neat now. The white plastic stuff in the cavity is called a fire sock, it's filled with mineral wool and designed to stop fire spreading into the roof space.
After working out what spacing is required for the tiles, we started felting and battening. Battens are required at 100mm centres for plain tiles (a bit like slates) which means an awful lot of nails and hammering, and aching hands for Kai at the end of it... Next time we'd go for large format interlocking tiles which cover a lot more area and need a lot less battening! They wouldn't look nearly as nice as plain tiles will though.
One side all finished, ready to get loaded up with tiles.
The windows arrived on Friday morning, and we had just enough time to fix and glaze the big French doors which will lead from the kitchen out to the decking.