Sunday 30 October 2011

Weeks 34 and 35 - A deadline looms



About 8 weeks ago we set ourselves the vague dealine of being in by end of October..... The carpets and Oak flooring are going to be laid this week so we've pretty much done it, no more decorating or messy work allowed inside after that, although there will be a snagging list to work our way through of course. We aim to move in on Friday the 4th, all being well.

We've been working extremely hard for the last two weeks getting lots of jobs done. Kai finished the kitchen, only the door handles need to be put on the cupboards now. We're over the moon with how the kitchen has turned out, it's a dream kitchen we thought we would only see in glossy magazines, and everything is laid out just as we want it so it should be a joy to cook in!


 
The boiler has been boxed into its own wall cupboard so that it blends in nicely with the rest of the kitchen units. It needed a bit of jiggery pokery with a filler strip as it stands a little pround from the other wall units but looks s good now. Kai covered and plastered in the pipes in the wall to get our seemless splashback with no horrible boxing, just needs a lick of paint now.
The patch on the ceiling is a repair to a section we had to cut out in a hurry to locate a water leak that the gas man left us as a gift! Sloppy soldering had left the joint dry which withstood pressure testing when cold but when the pipe heated up it sprung a leak! The water damage was minimal but still annoying, if you want something doing properly, do it yourself...
 
 Having grouted the travertine tiles, the floor looks fantastic. Skirting is on in the kitchen and just waiting for glossing and final colour on the walls (when we can decide what colour!)


Kai hung the glazed door to the kitchen, while I faffed about with preparing the stair ballustrading for the mind-numbing task of glossing...

 

Yet more glossing.


The sink for the wc in position. This will have a cupboard built underneath to hide the underfloor heating manifold and controls.

 

Kai's pleased with his efforts at plastering the side of the stair, a bit wobbly at first after nearly 2 years without touching a float but he's achieved a good finish that you can't tell apart from the professionally done wall opposite. It definitely reaffirmed that he doesn't like plastering, and it was money well spent to get someone in to do the majority of the work.  Just one more coat of gloss to go on the stair ballustrade...


Seeing as the weather's turned cold, we thought it's probably worth getting round to insulating the loft. Better to keep all that heat in than pump it all out the roof. 300mm of glass fibre insulation should do the trick. We're still getting to grips with the heating system, the undefloor heating seems to work really well and just gives off a gentle, constant heat throught the day, hopefully all this insulatuion will pay off and keep the bills down.

No comments:

Post a Comment